California Backflow & Chlorination California Backflow & Chlorination logo
Same-Day & Next-Day SchedulingPurveyor-ready reports on every job.
Call (858) 523-8113

You chlorinated the new line, flushed it, pulled the samples, and a few days later the lab report comes back with a word nobody wants to see: present. Or the coliform came back clean but the heterotrophic plate count is over 500. Either way, the line isn’t cleared, the inspector won’t sign off, and the schedule just slipped.

A failed Bac-T test is frustrating, but it’s common and it’s fixable. Here’s what the result actually means, why it happens, and the fastest way to a passing sample.

The short version: a failed sample usually means something got into the line or the sample: debris, a short contact time, a dirty sample tap or water that sat too long before sampling. Read which test failed, check how the sample was taken, then flush and re-sample. If it fails again, re-chlorinate and re-sample. AWWA C651 and California Plumbing Code 609.9 both call for repeating the process until the results are clean.

What a Bac-T Test Checks

After a new or repaired line is chlorinated and flushed, samples go to a state-certified lab for bacteriological testing. Depending on your water purveyor or inspector, the lab runs some or all of these:

Reading a Failed Result

Not every failure means the same thing. Look at which test failed and on which sample.

Total coliform present, E. coli absent

The most common failure. Something got into the line or the sample: soil, debris, trench water or a contaminated sample tap. It usually clears with a good flush and re-sample, or a re-chlorination if the first re-sample fails.

E. coli present

This one is more serious because it points to fecal contamination, such as a sewer line, a cross-connection or contaminated trench water. Don’t just re-chlorinate and hope. Find and fix the source first, and expect your purveyor to want to know about it.

HPC over 500 CFU/mL

Coliform can be absent while the plate count is high. That usually means bacteria grew in water that sat in the line, often in a long dead-end branch, warm plastic pipe or a line that waited too long between flushing and sampling. A thorough flush and a prompt re-sample often fixes it.

Chlorine injection pump connected to new water service piping on a construction site
Most failed samples trace back to what happened before and during chlorination.

The Most Common Causes

  1. Debris left in the line. Dirt and sediment from construction shield bacteria from the chlorine and use up the chlorine itself. Open pipe ends and a skipped pre-flush are the usual culprits.
  2. Not enough chlorine or contact time. If the dose was low, the chlorine was used up by debris, or the line was drained early, bacteria survive.
  3. A dirty sample tap. Sampling from a hose bib, a garden hose or an unsanitized tap can contaminate a perfectly clean line. This is one of the most common causes of a false failure.
  4. Dead ends and branches that weren’t flushed. Water that never moved during flushing can carry bacteria into the sample.
  5. Water that sat too long before sampling. The longer flushed water sits, the more time bacteria have to grow, which shows up as high HPC.
  6. Sample handling. Samples need sterile bottles, careful technique, cold storage and delivery to the lab within the holding time.
  7. A cross-connection. An unprotected connection to irrigation, a hose or another system can backflow into the new line. If results keep failing, check for one.

What to Do Next

1. Read the report closely

Note which sample failed, where it was taken and which test failed. One bad sample near a hose bib points somewhere very different than every sample failing.

2. Check how the sample was taken

If the failed sample came from a questionable tap, fix the sampling point before anything else. Re-sampling from the same dirty tap gets you the same result.

3. Flush and re-sample

AWWA C651 allows a failed new main to be re-flushed and re-sampled. For a single coliform hit or a high HPC, a thorough flush through every branch and a prompt re-sample is often all it takes.

4. Re-chlorinate if it fails again

If the check samples also fail, or E. coli is present, the line has to be chlorinated again and re-sampled. California Plumbing Code 609.9 says the same thing for building plumbing: repeat the procedure until the bacteriological results are clean. Fix the root cause first, whether that’s debris, a dead leg or a cross-connection, so the second round passes.

5. Keep your inspector and purveyor in the loop

Let them know a re-test is underway and when to expect new results. A re-chlorination adds at least a day of contact time plus a few business days of lab turnaround.

How to Pass the First Time

How We Handle a Failed Test

California Backflow & Chlorination pulls the samples on every chlorination job and coordinates the lab, so we see results as soon as the lab reports them. If a sample fails, we tell you what failed and why we think it happened, and we come back quickly to re-flush, re-chlorinate and re-sample. We also handle failed tests on lines another contractor chlorinated. Learn more about our bacteriological sampling.

Related reading

Need a waterline chlorinated or a backflow tested?

We chlorinate new and repaired water lines to AWWA C651, pull the bacteriological samples, and send you a purveyor-ready report. Serving San Diego, Orange, Los Angeles, Riverside and San Bernardino counties.

Call Now Button